Present: PS, MU, KL, CMacW, JT, IT, ABr, LF, CP, RB, PH, JC, MC
- Introduction;
- See slides. Points noted:
- Idea of fit-up/shake down "liked" so long as it fits the schedule and the personnel can be organised;
- Discussion:
- Points noted:
- Fit-up/shakedown:
- Many/most steps needed in any case;
- Forces and knowledge of forces discussed at length. Need for instrumentation noted by review panel accepted.
- DONM:
- AoB: