Model 97 - 25/05/2013
test model 97 op3 - solution file.
test model 97 - associated build files.
Solve Time = 149 hours.
Magnet Configuration: Step V Solenoid Mode - 240MeV/c - No return yoke.

Model 114 - 18/09/2013
test model 114 op3 - solution file.
test model 114 - associated build files.
Solve Time = 61h 29m.
Model Element Type = Linear.
Surface Element Type = Quadratic.

Magnet Configuration: Step VI Solenoid Mode - 240MeV/c - No return yoke.
This model includes an approximate outline of the substation with iron mass represented in the outer skin - 5300kg.

Shield Wall Model 16 - 08/09/2013
Shield Wall Sub Model 16 op3 - solution file.
Shield Wall Sub Model 16 - associated build files.
Solve Time = 14h 06m
Model Element Type: Linear.
Surface Element Type: Curved.
7 x 3 panels. Walls set to plate structure and with a 0mm gap between I beams. The centre of the wall has been placed at 3616mm, which is identical to that of the SSW. This should provide a reference model for comparison with Model 91.

Shield Wall Model 15 - 01/09/2013
Shield Wall Sub Model 15 op3 - solution file.
Shield Wall Sub Model 15 - associated build files.
Solve Time = 22h 04m
Model Element Type: Linear.
Surface Element Type: Curved.
7 x 3 panels. Walls set to plate structure and with a 1mm gap between I beams. The centre of the wall has been placed at 4962mm, which is identical to that of the NSW. This should provide a reference model for comparison with Model 91.